Customer Success Story

Power of Quality Management:
Gamuda Australia Elevates Project Performance in Scenario

CLIENT

Gamuda Australia:
Main Contractor of Sydney Metro West – Western Tunnelling Package

SUMMARY

Gamuda Australia is an EPCC contractor specialising in design, construction, operation and maintenance for large-mega infrastructure projects. Gamuda Australia and its partner were awarded the multi-billion Western Tunnelling Package(WTP) of the Sydney Metro West Project to deliver the twin 9km tunnels that form part of an underground railway connecting Greater Parramatta and the Sydney CBD.

Download the Case Study

Fill out the form below to download a copy of the case study that you can read anytime!

CHALLENGES

Gamuda needed a single source of truth to ensure credibility and provide real-time visibility of all project information, including construction drawings and project field data such as RFI, NCR and Hold Points.

The traditional document management approach relied on paper forms and manual processes, which meant the project team had to extract, sort out and analyse the raw data themselves. This made the team more prone to human error and the reporting process was significantly slowed down. 

The project teams were based in multiple locations where review and approval processes could be impacted due to paper form circulation. This undermined the team’s efficiency and ultimately led to delays in project schedules. Gamuda recognised that they needed a more efficient and streamlined
approach to manage their projects, and a centralised digital platform was the solution.

SOLUTIONS

Gamuda chose Scenario to manage their tunnelling project and provide a cloud-based solution for all project users across various locations. This allows for collaboration and access to real-time data and reporting. Gamuda was impressed with the intuitive and user-friendly interface of Scenario, which minimises training time and cost for internal and external teams.

Scenario’s flexibility in configuration allows Gamuda to tailor the system to their processes. David Kong, Quality & Systems Manager of Gamuda at WTP, expressed his satisfaction with the
system; “I like how Scenario has the flexibility to customise the software to suit our needs, and we build and evolve our processes.”  Gamuda can further digitalise and automate its processes to keep up with ongoing changes in the project.

Key Processes Managed by Scenario including:

• Quality
• NCR
• RFI
• Correspondence
• Reporting + PowerBI Integration

OUTCOMES

1. Elevated Project Performance

Scenario has been highly effective in ensuring high construction quality as the bespoke solution digitalises the evolving inspection processes in the project. It has helped to reduce the likelihood of errors and deviations in the inspection process and has increased the speed and accuracy of quality control procedures.

“Scenario has excellent capabilities and is a very good tool for managing construction quality with the ability to link forms to lots and prevent the closure of work lots with any associated open form.” States Sydney Metro West Team, the Client of Gamuda and the Project Owner, who is satisfied with the overall project performance and notes that the solution has minimised the risks in the overall Quality Management processes.

2. Ensured Accuracy of Data and Revisions

Scenario’s customised dashboards helped Gamuda gain oversight of project activity in real-time. All metadata, regardless of the document types, were already structured and standardised in the implementation and configuration stages. There is no more delay in reporting, and it significantly reduces the time to analyse the data.

Gamuda also integrated Scenario’s data with their internal system to further visualise the Quality Management activities. This helped the Quality team pick up the hold-ups faster and address them more efficiently.

LOCATION

Australia

3,500+

Inspection Processes Conducted

1,000+

Users from the wider Project team including the internal team, Project Owner, Consultants & Subcontractors

CONTACT US

Are you interested in learning more about Scenario? Contact our team today.

Customer Success Stories

Power of Quality Management:
Gamuda Australia Elevates
Project Performance in Scenario

LOCATION

Australia

1,000+

Users from the wider Project team including the internal team, Project Owner, Consultants & Sub-contractors

3,500+

Inspection Processes Conducted

CLIENT

Gamuda Australia: 
Main Contractor of Sydney Metro West – Western Tunnelling Package

SUMMARY

Gamuda Australia is an EPCC contractor specialising in design, construction, operation and maintenance for large-mega infrastructure projects. Gamuda Australia and its partner were
awarded the multi-billion Western Tunnelling Package(WTP) of the Sydney Metro West Project to deliver the twin 9km tunnels that form part of an underground railway connecting Greater Parramatta and the Sydney CBD.

CHALLENGES

Gamuda needed a single source of truth to ensure credibility and provide real-time visibility of all project information, including construction drawings and project field data such as RFI, NCR and Hold Points. 

The traditional document management approach relied on paper forms and manual processes, which meant the project team had to extract, sort out and analyse the raw data themselves. This made the team more prone to human error and the reporting process was significantly slowed down.

The project teams were based in multiple locations where review and approval processes could be impacted due to paper form circulation. This undermined the team’s efficiency and
ultimately led to delays in project schedules. Gamuda recognised that they needed a more efficient and streamlined approach to manage their projects, and a centralised digital 
platform was the solution.

SOLUTIONS

Gamuda chose Scenario to manage their tunnelling project and provide a cloud-based solution for all project users across various locations. This allows for collaboration and access to real-time data and reporting. Gamuda was impressed with the intuitive and user-friendly interface f Scenario, which minimises training time and cost for internal and external teams. 

Scenario’s flexibility in configuration allows Gamuda to tailor the system to their processes. David Kong, Quality & Systems Manager of Gamuda at WTP, expressed his satisfaction with the system; “I like how Scenario has the flexibility to customise the software to suit our needs, and we build and evolve our processes.” Gamuda can further digitalise and automate its processes to keep up with ongoing changes in the project.

Key Processes Managed by Scenario including:

• Quality
• NCR
• RFI
• Correspondence
• Reporting + PowerBI Integration

OUTCOMES

1. Elevated Project Performance

Scenario has been highly effective in ensuring high construction quality as the bespoke solution digitalises the evolving inspection processes in the project. It has helped to
reduce the likelihood of errors and deviations in the inspection process and has increased the speed and accuracy of quality control procedures.

Scenario has excellent capabilities and is a very good tool for managing construction quality with the ability to link forms to lots and prevent the closure of work lots with any associated open form.” States Sydney Metro West Team, the Client of Gamuda and the Project Owner, who is satisfied with the overall project performance and notes that the solution has minimised the risks in the overall Quality Management processes.

2. Improved Project Transparency

Scenario’s customised dashboards helped Gamuda gain oversight of project activity in real-time. All metadata, regardless of the document types, were already structured and standardised in the implementation and configuration stages. There is no more delay in reporting, and it significantly reduces the time to analyse the data.

Gamuda also integrated Scenario’s data with their internal system to further visualise the
Quality Management activities. This helped the Quality team pick up the hold-ups faster
and address them more efficiently.